Entry name:Xinfeng County Landfill Leachate Treatment Station
Project location:Yuecheng Landfill Site, Xinfeng County, Shaoguan City, Guangdong Province
Operation mode:Xinfeng County Domestic Waste Landfill Site (Phase I) Leachate Treatment Trustee Operation Xinfeng County Domestic Waste Landfill Leachate Emergency Treatment Operation Project
Technology:Two-stage DTRO treatment process Regulating tank + pretreatment + two-stage A/O + MBR (built-in UF) + nanofiltration (NF) + reverse osmosis (RO)
The first-stage equipment of Xinfeng County Leachate Treatment Station has a daily treatment capacity of 40 tons of filtrate, using two-stage DTRO treatment technology, and the second-stage treatment capacity of daily leachate treatment is 200 tons, using two-stage A/O+MBR (built-in UF)+ Nanofiltration (NF) + reverse osmosis (RO) treatment process, the effluent after leachate treatment meets the discharge concentration limit in Table 2 of the "Pollution Control Standard for Domestic Waste Landfills" (GB 16889-2008).
1. Prepared technical solutions;
2. Design process drawings;
3. On-site technical guidance;
4. Research and development of process materials.
1. Prepared electrical design scheme;
2. Wrote application control programs;
3. Design electrical automatic control drawings;
4. Electrical construction wiring debugging.
1. Prepared technical solutions;
2. Design process drawings;
3. On-site technical guidance;
4. Research and development of process materials.
1. Prepared mechanical design scheme;
2. Design 3D manufacturing drawings;
3. Machining drawing, mechanical design;
4. 3D design of site construction.
1. Prepare electrical design scheme
2. Write application control program;
3. Design electrical control drawings;
4. Electrical construction wiring debugging