Cases
POSTION : Home > Cases

Cases

Dongzhi Project

Dongzhi Project

Entry name:Dongzhi County Landfill Leachate Treatment Station

Project location:Landfill in Zhanggang Village, Dongliu Town, Dongzhi County, Chizhou City, Anhui Province

Operation mode:

Technology:Regulating tank + biochemical A/O + MBR (external UF) + nanofiltration (NF) + reverse osmosis (RO)


  • Case description

The designed landfill capacity of the Dongzhi County Domestic Waste Sanitary Landfill Site is about 1.562 million cubic meters. The leachate produced in the landfill is transported to the leachate regulating tank and finally sent to the leachate treatment station for treatment. The leachate regulating tank has a capacity of 10,000 The leachate station has a treatment capacity of 100 tons per day. After leachate treatment, the effluent is in accordance with the latest standard "Pollution Control Standards for Domestic Waste Landfills" (National Standard 16889-2008) promulgated by the Ministry of Environmental Protection. After the leachate treatment station reaches the standard, it is discharged into the nearby drainage ditches through the pipeline. )

Label

Qinrunze team